ITAC Assessment: SD0087
ITAC logo
ITAC Assessment: SD0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Folding Cartons, Corrgated Boxes, 2-piece Rigid Box
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 100,000
ft2
Annual Production 3,000
ton
Production Hrs. Annual 3,940
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,618 473,329
kWh
Natural Gas $8,737 1,137
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,866 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $5,687 $4,560 $5,687
46,307
kWh
-
02 2.2511: Insulate bare equipment $71 $60 $71
586
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $9,229 $10,500 $9,229
80,012
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,322 $2,887 $3,322
28,429
kWh
-
05 2.7144: Install spectral reflectors / delamp $5,445 $6,175 $5,445
43,669
kWh
-
06 2.7135: Install occupancy sensors $1,165 $800 $1,165
9,379
kWh
-
07 2.7132: Install timers on light switches in little used areas $1,235 $760 $1,235
9,672
kWh
-
08 2.7261: Install timers and/or thermostats $1,712 $400 $829
7,327
kWh
$883
-
MMBtu
TOTAL RECOMMENDED $27,866 $26,142 $26,983
225,381
kWh
$883
-
MMBtu
TOTAL IMPLEMENTED $10,002 $9,822 $10,002
81,770
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs