Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Material handling cranes & monrail systems
NAICS
n/a
SIC 3536: Overhead Traveling Cranes, Hoists, and Monorail Systems
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 95,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,539 529,500
kWh
Electricity Demand $17,209 2,483
kW-mo/yr
Natural Gas $29,724 3,250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,249

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,581 $2,500 - $2,581
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,252 - $3,610
41,068
kWh
$1,642
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $769 $135 $437
4,975
kWh
$332
-
kW-mo/yr
-
04 2.6212: Turn off equipment during breaks, reduce operating time $480 - $170
1,939
kWh
$310
-
kW-mo/yr
-
05 2.2522: Isolate hot or cold equipment $339 $1,615 - - $339
-
MMBtu
TOTAL RECOMMENDED $9,421 $4,250 $4,217
47,982
kWh
$4,865
-
kW-mo/yr
$339
-
MMBtu
TOTAL IMPLEMENTED $1,249 $135 $607
6,914
kWh
$642
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs