| Assessment Year | 1997 |
|---|---|
| Principal Product | injection molded plastic parts |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
66,900
ft2
|
| Annual Production | 40,000,000
pieces
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $35,988 | 2,417,644 |
kWh
|
$0.015 |
| Electricity Demand | $58,258 | 5,491 |
kW-mo/yr
|
$10.61 |
| Natural Gas | $2,670 | 774 |
MMBtu
|
$3.45 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $49,062 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $1,950 | $4,800 |
$910
60,961
kWh
|
$1,040
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $62 | $150 |
$29
2,052
kWh
|
$33
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $350 | $270 |
$160
11,137
kWh
|
$190
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 4.212: Adopt in-house material generation | $590 | $1,260 | - | - |
$590
-
lb
|
- | - | - | |
| 05 | 4.621: Use fixtures to reduce machine changeout times | $28,480 | $800 | - | - | - | - | - | $28,480 | |
| 06 | 4.623: Employ modular jigs to reduce process set-up time | $11,810 | $29,000 |
$(-40.0)
(-2,931)
kWh
|
$(-50.0)
-
kW-mo/yr
|
- | - | $11,900 | - | |
| 07 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $5,820 | $18,800 | - | - | - | $5,820 | - | - | |
| TOTAL RECOMMENDED | $49,062 | $55,080 |
$1,059
71,219
kWh
|
$1,213
-
kW-mo/yr
|
$590
-
lb
|
$5,820 | $11,900 | $28,480 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs