ITAC Assessment: SD0077
ITAC logo
ITAC Assessment: SD0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Bandoliered Electronic Components
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 51
Plant Area 48,000
ft2
Annual Production 1,000,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,289 1,885,698
kWh
Natural Gas $2,122 277
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $155,353 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $82,406

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $5,079 $2,580 $5,079
54,220
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $787 $250 $787
8,499
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,856 $40 $2,856
30,481
kWh
04 2.6231: Utilize controls to operate equipment only when needed $6,798 $2,660 $6,798
72,685
kWh
05 2.6218: Turn off equipment when not in use $47,310 $3,750 $47,310
505,862
kWh
06 2.6218: Turn off equipment when not in use $47,310 $22,000 $47,310
505,862
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $12,011 $9,450 $12,011
128,370
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $7,475 $10,268 $7,475
74,736
kWh
09 2.7132: Install timers on light switches in little used areas $10,312 $7,088 $10,312
101,407
kWh
10 2.7135: Install occupancy sensors $5,511 $240 $5,511
54,513
kWh
11 2.7142: Utilize higher efficiency lamps and/or ballasts $640 $1,880 $640
6,448
kWh
12 2.7261: Install timers and/or thermostats $411 $210 $411
1,758
kWh
13 2.7261: Install timers and/or thermostats $8,853 $600 $8,853
94,666
kWh
TOTAL RECOMMENDED $155,353 $61,016 $155,353
1,639,507
kWh
TOTAL IMPLEMENTED $82,406 $17,178 $82,406
869,578
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs