ITAC Assessment: DL0051
ITAC logo
ITAC Assessment: DL0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Commercial Printing
NAICS 323113: Commercial Screen Printing
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 78,200
ft2
Annual Production 52,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,480 2,547,756
kWh
Natural Gas $20,846 16,245
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,040 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,737

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7124: Make a practice of turning off lights when not needed $1,124 - $1,124
12,372
kWh
-
02 2.6218: Turn off equipment when not in use $573 - $573
6,311
kWh
-
03 2.5196: Use small number of high output units instead of many small inefficient units $940 $30 $940
23,000
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $2,500 $100 $2,500
28,000
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $860 $150 $860
9,500
kWh
-
06 2.1231: Establish burner maintenance schedule for boilers $4,250 $960 $450
5,000
kWh
$3,800
-
MMBtu
07 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $4,473 $3,840 $4,473
37,271
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $11,720 $20,796 $11,720
129,071
kWh
-
09 2.1224: Replace boiler $6,600 $16,743 - $6,600
-
MMBtu
TOTAL RECOMMENDED $33,040 $42,619 $22,640
250,525
kWh
$10,400
-
MMBtu
TOTAL IMPLEMENTED $11,737 $16,873 $5,137
69,683
kWh
$6,600
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs