Assessment Year | 2010 |
---|---|
Principal Product | Commercial Printing |
NAICS | 323113: Commercial Screen Printing |
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
78,200
ft2
|
Annual Production | 52,000,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $231,480 | 2,547,756 |
kWh
|
$0.091 |
Natural Gas | $20,846 | 16,245 |
MMBtu
|
$1.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,040 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,737 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $1,124 | - |
$1,124
12,372
kWh
|
- | |
02 | 2.6218: Turn off equipment when not in use | $573 | - |
$573
6,311
kWh
|
- | |
03 | 2.5196: Use small number of high output units instead of many small inefficient units | $940 | $30 |
$940
23,000
kWh
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,500 | $100 |
$2,500
28,000
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $860 | $150 |
$860
9,500
kWh
|
- | |
06 | 2.1231: Establish burner maintenance schedule for boilers | $4,250 | $960 |
$450
5,000
kWh
|
$3,800
-
MMBtu
|
|
07 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $4,473 | $3,840 |
$4,473
37,271
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,720 | $20,796 |
$11,720
129,071
kWh
|
- | |
09 | 2.1224: Replace boiler | $6,600 | $16,743 | - |
$6,600
-
MMBtu
|
|
TOTAL RECOMMENDED | $33,040 | $42,619 |
$22,640
250,525
kWh
|
$10,400
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,737 | $16,873 |
$5,137
69,683
kWh
|
$6,600
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs