ITAC Assessment: SD0060
ITAC logo
ITAC Assessment: SD0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product HEAT TREATING, HARDENING
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area
n/a
Annual Production 20,000
ton
Production Hrs. Annual 4,334
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,846 1,535,170
kWh
Natural Gas $30,275 5,389
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,284 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2514: Cover open tanks $1,443 $85 - $1,443
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $2,816 $10,500 - $2,816
-
MMBtu
-
03 2.2514: Cover open tanks $96 $54 - $96
-
MMBtu
-
04 2.6218: Turn off equipment when not in use $748 - $748
7,620
kWh
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,049 - $2,049
-
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $690 $87 $732
7,327
kWh
- $(-42.0)
07 2.7144: Install spectral reflectors / delamp $403 $480 $432
3,810
kWh
- $(-29.0)
08 2.6232: Install set-back timers $220 $360 $230
2,345
kWh
- $(-10.0)
09 2.7134: Use photocell controls $3,563 $2,475 $3,609
36,635
kWh
- $(-46.0)
10 2.7261: Install timers and/or thermostats $256 $300 $256
2,638
kWh
- -
TOTAL RECOMMENDED $12,284 $14,341 $8,056
60,375
kWh
$4,355
-
MMBtu
$(-127.0)
TOTAL IMPLEMENTED $4,515 $10,885 $256
2,638
kWh
$4,259
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs