| Assessment Year | 2008 |
|---|---|
| Principal Product | Paints |
| NAICS | 325510: Paint and Coating Manufacturing |
| SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
300,000
ft2
|
| Annual Production | 6,000
Tgal
|
| Production Hrs. Annual | 8,600
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $234,133 | 76,860,000 |
kWh
|
$0.003 |
| Electricity Demand | $136,614 | 14,376 |
kW-mo/yr
|
$9.50 |
| Electricity Fees | $9,515 | - |
|
- |
| Natural Gas | $201,166 | 17,445 |
MMBtu
|
$11.53 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,986 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,817 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.133: Alternate fuel | $1,350 | $1,000 | - | - |
$1,350
-
MMBtu
|
- | - | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,305 | $8,000 |
$812
-
kWh
|
$7,493
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $11,864 | $6,150 | - | - |
$11,864
-
MMBtu
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,333 | $100 |
$2,333
76,987
kWh
|
$900
-
kW-mo/yr
|
- | $(-600.0) | $(-300.0) | |
| 05 | 2.3132: Recharge batteries on during off-peak demand periods | $1,226 | - |
$262
-
kWh
|
$964
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4151: Develop a repair/replace policy | $1,644 | $2,483 |
$1,187
39,148
kWh
|
$457
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,264 | $4,408 |
$906
30,100
kWh
|
$358
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $27,986 | $22,141 |
$5,500
146,235
kWh
|
$10,172
-
kW-mo/yr
|
$13,214
-
MMBtu
|
$(-600.0) | $(-300.0) | ||
| TOTAL IMPLEMENTED | $7,817 | $7,991 |
$4,688
146,235
kWh
|
$2,679
-
kW-mo/yr
|
$1,350
-
MMBtu
|
$(-600.0) | $(-300.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs