Assessment Year | 1993 |
---|---|
Principal Product | BAKERY GOODS |
NAICS |
n/a
|
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
n/a
|
Annual Production | 1,500,000
pieces
|
Production Hrs. Annual | 6,248
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $190,236 | 2,352,872 |
kWh
|
$0.081 |
Natural Gas | $77,536 | 16,499 |
MMBtu
|
$4.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,956 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,376 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $253 | $351 | - |
$253
-
MMBtu
|
- | |
02 | 2.2515: Use optimum thickness insulation | $251 | $243 |
$251
3,224
kWh
|
- | - | |
03 | 2.2515: Use optimum thickness insulation | $495 | $232 |
$495
6,155
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,362 | - |
$1,681
20,809
kWh
|
- | $(-319.0) | |
05 | 2.7144: Install spectral reflectors / delamp | $879 | $1,600 |
$731
9,086
kWh
|
- | $148 | |
06 | 2.6232: Install set-back timers | $663 | $2,560 |
$527
6,448
kWh
|
- | $136 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $112 | $44 |
$74
879
kWh
|
- | $38 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,469 | $624 |
$1,197
14,947
kWh
|
- | $272 | |
09 | 2.7261: Install timers and/or thermostats | $1,472 | $300 |
$1,356
16,706
kWh
|
$116
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $6,956 | $5,954 |
$6,312
78,254
kWh
|
$369
-
MMBtu
|
$275 | ||
TOTAL IMPLEMENTED | $4,376 | $4,460 |
$4,295
53,049
kWh
|
$116
-
MMBtu
|
$(-35.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs