ITAC Assessment: SD0059
ITAC logo
ITAC Assessment: SD0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product BAKERY GOODS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 1,500,000
pieces
Production Hrs. Annual 6,248
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,236 2,352,872
kWh
Natural Gas $77,536 16,499
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,956 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,376

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $253 $351 - $253
-
MMBtu
-
02 2.2515: Use optimum thickness insulation $251 $243 $251
3,224
kWh
- -
03 2.2515: Use optimum thickness insulation $495 $232 $495
6,155
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,362 - $1,681
20,809
kWh
- $(-319.0)
05 2.7144: Install spectral reflectors / delamp $879 $1,600 $731
9,086
kWh
- $148
06 2.6232: Install set-back timers $663 $2,560 $527
6,448
kWh
- $136
07 2.7142: Utilize higher efficiency lamps and/or ballasts $112 $44 $74
879
kWh
- $38
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,469 $624 $1,197
14,947
kWh
- $272
09 2.7261: Install timers and/or thermostats $1,472 $300 $1,356
16,706
kWh
$116
-
MMBtu
-
TOTAL RECOMMENDED $6,956 $5,954 $6,312
78,254
kWh
$369
-
MMBtu
$275
TOTAL IMPLEMENTED $4,376 $4,460 $4,295
53,049
kWh
$116
-
MMBtu
$(-35.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs