ITAC Assessment: SD0049
ITAC logo
ITAC Assessment: SD0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product TECH CERAMIC MATERIAL
NAICS
n/a
SIC 3264: Porcelain Electrical Supplies
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area
n/a
Annual Production 37,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,059 2,211,020
kWh
Natural Gas $346 38
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,566 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,254

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $720 $470 $720
7,620
kWh
- -
02 2.7261: Install timers and/or thermostats $1,902 $300 $1,583
16,413
kWh
$319
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $815 - $902
8,499
kWh
- $(-87.0)
04 2.7144: Install spectral reflectors / delamp $1,500 $2,520 $1,314
13,482
kWh
- $186
05 2.6232: Install set-back timers $1,317 $2,120 $1,144
11,723
kWh
- $173
06 2.2491: Use cooling air which cools hot work pieces for space heating $3,312 $11,632 $3,312
34,291
kWh
- -
TOTAL RECOMMENDED $9,566 $17,042 $8,975
92,028
kWh
$319
-
MMBtu
$272
TOTAL IMPLEMENTED $6,254 $5,410 $5,663
57,737
kWh
$319
-
MMBtu
$272
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs