ITAC Assessment: MI0399
ITAC logo
ITAC Assessment: MI0399
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Cartridge valves
NAICS 332919: Other Metal Valve and Pipe Fitting Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $100
M
to 500
M
# of Employees 430
Plant Area 160,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $535,395 11,654,080
kWh
Electricity Demand $255,395 20,520
kW-mo/yr
Electricity Fees $43,803 -
Natural Gas $18,648 4,418
MMBtu
Waste Disposal Costs
Water Usage $3,582 1,272
Tgal
Water Disposal $8,328 1,272
Tgal
TOTAL YEARLY COSTS $865,151
RECOMMENDED SAVINGS* $223,142 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $103,016

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $115,960 $157,500 $106,213
2,308,982
kWh
$43,013
-
kW-mo/yr
$(-33,266.0)
-
MMBtu
-
02 2.2622: Replace existing chiller with high efficiency model $54,060 $240,000 $35,690
775,869
kWh
$18,370
-
kW-mo/yr
- -
03 2.7221: Lower temperature during the winter season and vice-versa $21,020 $320 $15,245
331,421
kWh
$5,775
-
kW-mo/yr
- -
04 2.7425: Clean or color roof to reduce solar load $15,245 $70,400 $11,200
243,478
kWh
$4,045
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,405 $1,670 $7,957
172,977
kWh
$3,448
-
kW-mo/yr
- -
06 3.4155: Meter waste water $4,166 $900 - - - $4,166
-
Tgal
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,286 $4,468 $1,286
27,961
kWh
- - -
TOTAL RECOMMENDED $223,142 $475,258 $177,591
3,860,688
kWh
$74,651
-
kW-mo/yr
$(-33,266.0)
-
MMBtu
$4,166
-
Tgal
TOTAL IMPLEMENTED $103,016 $316,858 $71,378
1,551,706
kWh
$31,638
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings