Assessment Year | 2022 |
---|---|
Principal Product | Cartridge valves |
NAICS | 332919: Other Metal Valve and Pipe Fitting Manufacturing |
SIC | 3492: Fluid Power Valves and Hose Fittings |
Sales Range | $100 M to 500M |
# of Employees | 430 |
Plant Area |
160,000
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $535,395 | 11,654,080 |
kWh
|
$0.046 | |
Electricity Demand | $255,395 | 20,520 |
kW-mo/yr
|
$12.45 | |
Electricity Fees | $43,803 | - |
|
- | |
Natural Gas | $18,648 | 4,418 |
MMBtu
|
$4.22 | |
Waste Disposal Costs | |||||
Water Usage | $3,582 | 1,272 |
Tgal
|
$2.82 | |
Water Disposal | $8,328 | 1,272 |
Tgal
|
$6.55 | |
TOTAL YEARLY COSTS | $865,151 | ||||
RECOMMENDED SAVINGS* | $223,142 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $103,016 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $115,960 | $157,500 |
$106,213
2,308,982
kWh
|
$43,013
-
kW-mo/yr
|
$(-33,266.0)
-
MMBtu
|
- | |
02 | 2.2622: Replace existing chiller with high efficiency model | $54,060 | $240,000 |
$35,690
775,869
kWh
|
$18,370
-
kW-mo/yr
|
- | - | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $21,020 | $320 |
$15,245
331,421
kWh
|
$5,775
-
kW-mo/yr
|
- | - | |
04 | 2.7425: Clean or color roof to reduce solar load | $15,245 | $70,400 |
$11,200
243,478
kWh
|
$4,045
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,405 | $1,670 |
$7,957
172,977
kWh
|
$3,448
-
kW-mo/yr
|
- | - | |
06 | 3.4155: Meter waste water | $4,166 | $900 | - | - | - |
$4,166
-
Tgal
|
|
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,286 | $4,468 |
$1,286
27,961
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $223,142 | $475,258 |
$177,591
3,860,688
kWh
|
$74,651
-
kW-mo/yr
|
$(-33,266.0)
-
MMBtu
|
$4,166
-
Tgal
|
||
TOTAL IMPLEMENTED | $103,016 | $316,858 |
$71,378
1,551,706
kWh
|
$31,638
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs