| Assessment Year | 1992 |
|---|---|
| Principal Product | PLASTIC INJECTION PARTS |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 90 |
| Plant Area |
n/a
|
| Annual Production | 1,000,000
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $292,855 | 3,606,096 |
kWh
|
$0.081 |
| Natural Gas | $569 | 60 |
MMBtu
|
$9.48 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,833 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,707 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $913 | $2,970 |
$913
11,137
kWh
|
- | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $17,072 | $3,437 |
$17,072
210,141
kWh
|
- | |
| 03 | 2.2511: Insulate bare equipment | $6,143 | $297 |
$6,143
75,615
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $750 | $397 |
$750
9,379
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $287 | $392 |
$357
4,396
kWh
|
$(-70.0) | |
| 06 | 2.7123: Keep lamps and reflectors clean | $2,507 | $7,150 |
$2,155
26,377
kWh
|
$352 | |
| 07 | 2.6232: Install set-back timers | $1,480 | $1,520 |
$1,185
14,654
kWh
|
$295 | |
| 08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,681 | $800 |
$1,526
18,757
kWh
|
$155 | |
| TOTAL RECOMMENDED | $30,833 | $16,963 |
$30,101
370,456
kWh
|
$732 | ||
| TOTAL IMPLEMENTED | $3,707 | $10,512 |
$3,425
41,910
kWh
|
$282 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs