| Assessment Year | 1998 |
|---|---|
| Principal Product | Anodizing |
| NAICS |
n/a
|
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 49 |
| Plant Area |
12,000
ft2
|
| Annual Production | 5,500
thousand feet
|
| Production Hrs. Annual | 2,574
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $29,173 | 550,703 |
kWh
|
$0.053 |
| Electricity Demand | $122,324 | 5,665 |
kW-mo/yr
|
$21.59 |
| Electricity Fees | $(-1,341.0) | - |
|
- |
| Natural Gas | $18,957 | 2,072 |
MMBtu
|
$9.15 |
| Fuel Oil #2 | $47,363 | 8,131 |
MMBtu
|
$5.82 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $105,519 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,913 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,163 | $10,944 |
$868
14,068
kWh
|
$1,295
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $88,443 | $310,000 |
$29,187
550,996
kWh
|
$122,286
-
kW-mo/yr
|
$(-43,839.0)
-
MMBtu
|
$(-19,191.0) | - | |
| 03 | 2.2136: Install / repair insulation on steam lines | $532 | $325 | - | - |
$532
-
MMBtu
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $1,232 | $1,008 | - | - |
$1,232
-
MMBtu
|
- | - | |
| 05 | 2.2123: Insulate feedwater tank | $227 | $72 | - | - |
$227
-
MMBtu
|
- | - | |
| 06 | 3.4116: Meter recycled water (to reduce sewer charges) | $12,922 | $250 | - | - | - | - |
$12,922
-
Tgal
|
|
| TOTAL RECOMMENDED | $105,519 | $322,599 |
$30,055
565,064
kWh
|
$123,581
-
kW-mo/yr
|
$(-41,848.0)
-
MMBtu
|
$(-19,191.0) |
$12,922
-
Tgal
|
||
| TOTAL IMPLEMENTED | $14,913 | $1,655 | - | - |
$1,991
-
MMBtu
|
- |
$12,922
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs