ITAC Assessment: HO0181
ITAC logo
ITAC Assessment: HO0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Anodizing
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 49
Plant Area 12,000
ft2
Annual Production 5,500
thousand feet
Production Hrs. Annual 2,574
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,173 550,703
kWh
Electricity Demand $122,324 5,665
kW-mo/yr
Electricity Fees $(-1,341.0) -
Natural Gas $18,957 2,072
MMBtu
Fuel Oil #2 $47,363 8,131
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,519 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,913

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,163 $10,944 $868
14,068
kWh
$1,295
-
kW-mo/yr
- - -
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $88,443 $310,000 $29,187
550,996
kWh
$122,286
-
kW-mo/yr
$(-43,839.0)
-
MMBtu
$(-19,191.0) -
03 2.2136: Install / repair insulation on steam lines $532 $325 - - $532
-
MMBtu
- -
04 2.2511: Insulate bare equipment $1,232 $1,008 - - $1,232
-
MMBtu
- -
05 2.2123: Insulate feedwater tank $227 $72 - - $227
-
MMBtu
- -
06 3.4116: Meter recycled water (to reduce sewer charges) $12,922 $250 - - - - $12,922
-
Tgal
TOTAL RECOMMENDED $105,519 $322,599 $30,055
565,064
kWh
$123,581
-
kW-mo/yr
$(-41,848.0)
-
MMBtu
$(-19,191.0) $12,922
-
Tgal
TOTAL IMPLEMENTED $14,913 $1,655 - - $1,991
-
MMBtu
- $12,922
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs