ITAC Assessment: SD0032
ITAC logo
ITAC Assessment: SD0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product EXTRUDED AL. HEAT SINKS
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $5
M
to 10
M
# of Employees 94
Plant Area
n/a
Annual Production 1,500,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,218 853,751
kWh
Natural Gas $20,957 3,128
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,106 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,887

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $549 $3,710 $549
4,396
kWh
- -
02 2.7261: Install timers and/or thermostats $5,950 $200 $4,603
37,222
kWh
$1,347
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $3,288 $1,510 - $3,288
-
MMBtu
-
04 2.6212: Turn off equipment during breaks, reduce operating time $2,038 - - $2,038
-
MMBtu
-
05 2.1231: Establish burner maintenance schedule for boilers $5,219 $3,900 - $5,219
-
MMBtu
-
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $138 $374 - $138
-
MMBtu
-
07 2.2511: Insulate bare equipment $68 $172 - $68
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,350 $1,020 $1,543
12,603
kWh
- $(-193.0)
09 2.7123: Keep lamps and reflectors clean $2,987 $4,750 $2,698
21,981
kWh
- $289
10 2.7111: Reduce illumination to minimum necessary levels $1,664 $930 $1,443
11,723
kWh
- $221
11 2.6232: Install set-back timers $855 $818 $775
6,155
kWh
- $80
TOTAL RECOMMENDED $24,106 $17,384 $11,611
94,080
kWh
$12,098
-
MMBtu
$397
TOTAL IMPLEMENTED $9,887 $4,930 $6,695
54,221
kWh
$3,385
-
MMBtu
$(-193.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs