Assessment Year | 1992 |
---|---|
Principal Product | EXTRUDED AL. HEAT SINKS |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $5 M to 10M |
# of Employees | 94 |
Plant Area |
n/a
|
Annual Production | 1,500,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $105,218 | 853,751 |
kWh
|
$0.12 |
Natural Gas | $20,957 | 3,128 |
MMBtu
|
$6.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,106 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,887 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $549 | $3,710 |
$549
4,396
kWh
|
- | - | |
02 | 2.7261: Install timers and/or thermostats | $5,950 | $200 |
$4,603
37,222
kWh
|
$1,347
-
MMBtu
|
- | |
03 | 2.2437: Recover waste heat from equipment | $3,288 | $1,510 | - |
$3,288
-
MMBtu
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,038 | - | - |
$2,038
-
MMBtu
|
- | |
05 | 2.1231: Establish burner maintenance schedule for boilers | $5,219 | $3,900 | - |
$5,219
-
MMBtu
|
- | |
06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $138 | $374 | - |
$138
-
MMBtu
|
- | |
07 | 2.2511: Insulate bare equipment | $68 | $172 | - |
$68
-
MMBtu
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,350 | $1,020 |
$1,543
12,603
kWh
|
- | $(-193.0) | |
09 | 2.7123: Keep lamps and reflectors clean | $2,987 | $4,750 |
$2,698
21,981
kWh
|
- | $289 | |
10 | 2.7111: Reduce illumination to minimum necessary levels | $1,664 | $930 |
$1,443
11,723
kWh
|
- | $221 | |
11 | 2.6232: Install set-back timers | $855 | $818 |
$775
6,155
kWh
|
- | $80 | |
TOTAL RECOMMENDED | $24,106 | $17,384 |
$11,611
94,080
kWh
|
$12,098
-
MMBtu
|
$397 | ||
TOTAL IMPLEMENTED | $9,887 | $4,930 |
$6,695
54,221
kWh
|
$3,385
-
MMBtu
|
$(-193.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs