ITAC Assessment: MA0073
ITAC logo
ITAC Assessment: MA0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product ELECTRONIC TEST INSTRUMENTS
NAICS
n/a
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area
n/a
Annual Production 2,500
pieces
Production Hrs. Annual 1,920
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,413 211,899
kWh
Fuel Oil #2 $5,810 980
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,349 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,084 $500 - $1,084
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $141 $210 $141
1,465
kWh
-
03 2.7492: Use proper thickness of insulation on building envelope $4,124 $12,000 - $4,124
-
MMBtu
TOTAL RECOMMENDED $5,349 $12,710 $141
1,465
kWh
$5,208
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs