Assessment Year | 2004 |
---|---|
Principal Product | Electroplating of aerospace components |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 67 |
Plant Area |
35,000
ft2
|
Annual Production | 1,100,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $137,343 | 2,476,457 |
kWh
|
$0.055 |
Electricity Demand | $54,013 | 6,329 |
kW-mo/yr
|
$8.53 |
Electricity Fees | $11,579 | - |
|
- |
Natural Gas | $194,594 | 27,673 |
MMBtu
|
$7.03 |
Fuel Oil #2 | $27,817 | 2,516 |
MMBtu
|
$11.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,572 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $66,227 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1333: Convert combustion equipment to burn oil | $36,008 | - | - |
$206,291
-
MMBtu
|
$(-170,283.0)
-
MMBtu
|
- | - | |
02 | 3.4156: Use flow control valves on equipment to optimize water use | $13,353 | $27,860 | - | - | - |
$13,353
-
Tgal
|
- | |
03 | 2.7314: Reduce ventilation air | $10,267 | $4,614 |
$752
10,600
kWh
|
$7,961
-
MMBtu
|
$1,554
-
MMBtu
|
- | - | |
04 | 2.2136: Install / repair insulation on steam lines | $7,302 | $4,680 | - |
$7,302
-
MMBtu
|
- | - | - | |
05 | 2.2135: Repair and eliminate steam leaks | $2,941 | $138 | - |
$2,941
-
MMBtu
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $2,601 | $850 | - |
$2,601
-
MMBtu
|
- | - | - | |
07 | 4.821: Pay bills on time to avoid late fees | $2,179 | - | - | - | - | - | $2,179 | |
08 | 2.1213: Direct warmest air to combustion intake | $1,078 | $173 | - |
$920
-
MMBtu
|
$158
-
MMBtu
|
- | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $958 | $1,020 |
$958
13,100
kWh
|
- | - | - | - | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $885 | $50 |
$885
12,100
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $77,572 | $39,385 |
$2,595
35,800
kWh
|
$228,016
-
MMBtu
|
$(-168,571.0)
-
MMBtu
|
$13,353
-
Tgal
|
$2,179 | ||
TOTAL IMPLEMENTED | $66,227 | $34,598 |
$1,843
25,200
kWh
|
$219,135
-
MMBtu
|
$(-170,283.0)
-
MMBtu
|
$13,353
-
Tgal
|
$2,179 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs