ITAC Assessment: MA0551
ITAC logo
ITAC Assessment: MA0551
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Electroplating of aerospace components
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 67
Plant Area 35,000
ft2
Annual Production 1,100,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,343 2,476,457
kWh
Electricity Demand $54,013 6,329
kW-mo/yr
Electricity Fees $11,579 -
Natural Gas $194,594 27,673
MMBtu
Fuel Oil #2 $27,817 2,516
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,572 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Water Disposal Savings Administrative Changes Savings
01 2.1333: Convert combustion equipment to burn oil $36,008 - - $206,291
-
MMBtu
$(-170,283.0)
-
MMBtu
- -
02 3.4156: Use flow control valves on equipment to optimize water use $13,353 $27,860 - - - $13,353
-
Tgal
-
03 2.7314: Reduce ventilation air $10,267 $4,614 $752
10,600
kWh
$7,961
-
MMBtu
$1,554
-
MMBtu
- -
04 2.2136: Install / repair insulation on steam lines $7,302 $4,680 - $7,302
-
MMBtu
- - -
05 2.2135: Repair and eliminate steam leaks $2,941 $138 - $2,941
-
MMBtu
- - -
06 2.2437: Recover waste heat from equipment $2,601 $850 - $2,601
-
MMBtu
- - -
07 4.821: Pay bills on time to avoid late fees $2,179 - - - - - $2,179
08 2.1213: Direct warmest air to combustion intake $1,078 $173 - $920
-
MMBtu
$158
-
MMBtu
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $958 $1,020 $958
13,100
kWh
- - - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $885 $50 $885
12,100
kWh
- - - -
TOTAL RECOMMENDED $77,572 $39,385 $2,595
35,800
kWh
$228,016
-
MMBtu
$(-168,571.0)
-
MMBtu
$13,353
-
Tgal
$2,179
TOTAL IMPLEMENTED $66,227 $34,598 $1,843
25,200
kWh
$219,135
-
MMBtu
$(-170,283.0)
-
MMBtu
$13,353
-
Tgal
$2,179
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs