ITAC Assessment: SD0026
ITAC logo
ITAC Assessment: SD0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLASTIC BAGS AND BOTTLES
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 173
Plant Area
n/a
Annual Production 10,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,697 2,901,817
kWh
Natural Gas $384 55
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $978 $1,000 $978
15,533
kWh
- -
02 2.7261: Install timers and/or thermostats $2,832 $200 $1,581
25,205
kWh
$1,251
-
MMBtu
-
03 2.4239: Eliminate or reduce compressed air usage $4,982 $350 $4,982
79,132
kWh
- -
04 2.2691: Shut off cooling if cold outside air will cool process $4,723 $499 $4,723
75,029
kWh
- -
05 2.2511: Insulate bare equipment $941 $71 $941
14,947
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $178 $175 $92
1,465
kWh
- $86
07 2.6232: Install set-back timers $1,004 $2,880 $849
13,482
kWh
- $155
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,663 $2,420 $314
4,982
kWh
- $1,349
TOTAL RECOMMENDED $17,301 $7,595 $14,460
229,775
kWh
$1,251
-
MMBtu
$1,590
TOTAL IMPLEMENTED $17,301 $7,595 $14,460
229,775
kWh
$1,251
-
MMBtu
$1,590
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs