ITAC Assessment: SD0021
ITAC logo
ITAC Assessment: SD0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product IND. INORGANIC CHEMICALS
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 126
Plant Area
n/a
Annual Production 1,350
pieces
Production Hrs. Annual 4,845
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,500 2,332,943
kWh
Natural Gas $14,370 2,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,271 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,660

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $500 $1,630 $500
6,448
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $169 $300 $169
2,052
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $511 $15 $511
6,448
kWh
-
04 2.2511: Insulate bare equipment $241 $201 $241
3,224
kWh
-
05 2.2444: Use hot process fluids to preheat incoming process fluids $2,442 $3,285 $2,442
31,067
kWh
-
06 2.7123: Keep lamps and reflectors clean $15,162 $1,790 $13,698
174,971
kWh
$1,464
07 2.6232: Install set-back timers $2,806 $32,868 $2,498
31,946
kWh
$308
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,552 $9,150 $838
10,844
kWh
$714
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,888 $1,739 $927
11,723
kWh
$2,961
TOTAL RECOMMENDED $27,271 $50,978 $21,824
278,723
kWh
$5,447
TOTAL IMPLEMENTED $24,660 $47,393 $19,213
245,604
kWh
$5,447
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs