Assessment Year | 1992 |
---|---|
Principal Product | IND. INORGANIC CHEMICALS |
NAICS |
n/a
|
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 126 |
Plant Area |
n/a
|
Annual Production | 1,350
pieces
|
Production Hrs. Annual | 4,845
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $182,500 | 2,332,943 |
kWh
|
$0.078 |
Natural Gas | $14,370 | 2,283 |
MMBtu
|
$6.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,271 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,660 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $500 | $1,630 |
$500
6,448
kWh
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $169 | $300 |
$169
2,052
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $511 | $15 |
$511
6,448
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $241 | $201 |
$241
3,224
kWh
|
- | |
05 | 2.2444: Use hot process fluids to preheat incoming process fluids | $2,442 | $3,285 |
$2,442
31,067
kWh
|
- | |
06 | 2.7123: Keep lamps and reflectors clean | $15,162 | $1,790 |
$13,698
174,971
kWh
|
$1,464 | |
07 | 2.6232: Install set-back timers | $2,806 | $32,868 |
$2,498
31,946
kWh
|
$308 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,552 | $9,150 |
$838
10,844
kWh
|
$714 | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,888 | $1,739 |
$927
11,723
kWh
|
$2,961 | |
TOTAL RECOMMENDED | $27,271 | $50,978 |
$21,824
278,723
kWh
|
$5,447 | ||
TOTAL IMPLEMENTED | $24,660 | $47,393 |
$19,213
245,604
kWh
|
$5,447 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs