ITAC Assessment: MS0019
ITAC logo
ITAC Assessment: MS0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Men's Work Pants
NAICS
n/a
SIC 2326: Men's and Boys' Work Clothing
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area 45,000
ft2
Annual Production 4,147,200
pieces
Production Hrs. Annual 3,800
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,616 3,184,056
kWh
Natural Gas $35,662 10,869
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,029 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,775

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $5,016 $10,000 - $5,016
-
MMBtu
02 2.3212: Optimize plant power factor $5,174 $3,750 $5,174
-
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,539 $500 $1,539
24,326
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,429 $1,436 $4,429
66,237
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $1,563 - $1,563
21,102
kWh
-
06 2.2136: Install / repair insulation on steam lines $675 $1,540 $361
11,137
kWh
$314
-
MMBtu
07 2.4133: Use most efficient type of electric motors $633 $1,800 $633
6,155
kWh
-
TOTAL RECOMMENDED $19,029 $19,026 $13,699
128,957
kWh
$5,330
-
MMBtu
TOTAL IMPLEMENTED $11,775 $7,486 $11,775
96,718
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs