ITAC Assessment: WI0233
ITAC logo
ITAC Assessment: WI0233
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Bread, buns & rolls
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 175,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,796 2,173,212
kWh
Natural Gas $140,867 47,070
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,187

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,847 $8,000 $5,847
-
kWh
- - -
02 2.2621: Modify refrigeration system to operate at a lower pressure $5,652 $12,000 $5,652
106,975
kWh
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,790 $500 - $3,790
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,066 $1,860 $2,066
39,273
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $550 - $550
10,551
kWh
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $196 - $196
3,810
kWh
- - -
07 2.2612: Use cooling tower water instead of refrigeration $5,470 $12,000 - - $5,470
-
Tgal
-
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,000 - - - - $5,000
-
lb
TOTAL RECOMMENDED $28,571 $34,360 $14,311
160,609
kWh
$3,790
-
MMBtu
$5,470
-
Tgal
$5,000
-
lb
TOTAL IMPLEMENTED $15,187 $8,500 $6,397
10,551
kWh
$3,790
-
MMBtu
- $5,000
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs