ITAC Assessment: SD0013
ITAC logo
ITAC Assessment: SD0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product AEROSPACE SHEET MTL COMP
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 2,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,498 1,538,394
kWh
Natural Gas $54,208 9,635
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1131: Repair faulty insulation in furnaces, boilers, etc $3,322 $1,636 - $3,322
-
MMBtu
-
02 2.2531: Re-size charging openings or add movable cover or door $5,150 $367 - $5,150
-
MMBtu
-
03 2.2531: Re-size charging openings or add movable cover or door $2,029 $400 $2,029
23,154
kWh
- -
04 2.4133: Use most efficient type of electric motors $397 $842 $397
4,396
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $900 $1,120 $671
7,620
kWh
- $229
06 2.6232: Install set-back timers $620 $1,500 $561
6,448
kWh
- $59
07 2.7123: Keep lamps and reflectors clean $9,710 $15,772 $9,004
98,769
kWh
- $706
08 2.7261: Install timers and/or thermostats $7,361 $20 $7,361
167,644
kWh
- -
TOTAL RECOMMENDED $29,489 $21,657 $20,023
308,031
kWh
$8,472
-
MMBtu
$994
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs