| Assessment Year | 1992 |
|---|---|
| Principal Product | AEROSPACE SHEET MTL COMP |
| NAICS |
n/a
|
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 2,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $135,498 | 1,538,394 |
kWh
|
$0.088 |
| Natural Gas | $54,208 | 9,635 |
MMBtu
|
$5.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,489 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $3,322 | $1,636 | - |
$3,322
-
MMBtu
|
- | |
| 02 | 2.2531: Re-size charging openings or add movable cover or door | $5,150 | $367 | - |
$5,150
-
MMBtu
|
- | |
| 03 | 2.2531: Re-size charging openings or add movable cover or door | $2,029 | $400 |
$2,029
23,154
kWh
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $397 | $842 |
$397
4,396
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $900 | $1,120 |
$671
7,620
kWh
|
- | $229 | |
| 06 | 2.6232: Install set-back timers | $620 | $1,500 |
$561
6,448
kWh
|
- | $59 | |
| 07 | 2.7123: Keep lamps and reflectors clean | $9,710 | $15,772 |
$9,004
98,769
kWh
|
- | $706 | |
| 08 | 2.7261: Install timers and/or thermostats | $7,361 | $20 |
$7,361
167,644
kWh
|
- | - | |
| TOTAL RECOMMENDED | $29,489 | $21,657 |
$20,023
308,031
kWh
|
$8,472
-
MMBtu
|
$994 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs