Assessment Year | 2017 |
---|---|
Principal Product | Metal finishing |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 54 |
Plant Area |
120,000
ft2
|
Annual Production | 600
units
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Rhode Island |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $42,202 | 372,775 |
kWh
|
$0.11 |
Electricity Demand | $6,199 | 1,954 |
kW-mo/yr
|
$3.17 |
Electricity Fees | $14,076 | - |
|
- |
Natural Gas | $59,309 | 6,700 |
MMBtu
|
$8.85 |
TOTAL YEARLY COSTS | $121,786 | |||
RECOMMENDED SAVINGS* | $8,856 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,600 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,553 | $10,235 |
$3,553
31,441
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,550 | $7,200 |
$2,550
22,570
kWh
|
- | |
03 | 2.3212: Optimize plant power factor | $1,069 | $3,189 | - |
$1,069
-
kW-mo/yr
|
|
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $602 | $20 |
$602
5,332
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $551 | $300 |
$551
4,875
kWh
|
- | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $499 | $20 |
$499
4,417
kWh
|
- | |
07 | 2.7135: Install occupancy sensors | $32 | $144 |
$32
283
kWh
|
- | |
TOTAL RECOMMENDED | $8,856 | $21,108 |
$7,787
68,918
kWh
|
$1,069
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $3,600 | $7,520 |
$3,600
31,862
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs