ITAC Assessment: MA0772
ITAC logo
ITAC Assessment: MA0772
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Metal finishing
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 54
Plant Area 120,000
ft2
Annual Production 600
units
Production Hrs. Annual 2,210
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,202 372,775
kWh
Electricity Demand $6,199 1,954
kW-mo/yr
Electricity Fees $14,076 -
Natural Gas $59,309 6,700
MMBtu
TOTAL YEARLY COSTS $121,786
RECOMMENDED SAVINGS* $8,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,553 $10,235 $3,553
31,441
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,550 $7,200 $2,550
22,570
kWh
-
03 2.3212: Optimize plant power factor $1,069 $3,189 - $1,069
-
kW-mo/yr
04 2.6212: Turn off equipment during breaks, reduce operating time $602 $20 $602
5,332
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $551 $300 $551
4,875
kWh
-
06 2.6212: Turn off equipment during breaks, reduce operating time $499 $20 $499
4,417
kWh
-
07 2.7135: Install occupancy sensors $32 $144 $32
283
kWh
-
TOTAL RECOMMENDED $8,856 $21,108 $7,787
68,918
kWh
$1,069
-
kW-mo/yr
TOTAL IMPLEMENTED $3,600 $7,520 $3,600
31,862
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs