ITAC Assessment: RU0165
ITAC logo
ITAC Assessment: RU0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PVC RESINS
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 40
Plant Area
n/a
Annual Production 50,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $568,743 6,723,036
kWh
Natural Gas $94,003 18,056
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,829

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $16,431 $5,000 - $16,431
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $3,775 $479 $3,775
44,549
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $617 - $617
7,327
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,153 $2,000 $1,153
13,775
kWh
- -
05 2.2122: Install / repair insulation on condensate lines $752 $330 - $752
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,796 $105 $1,901
22,567
kWh
- $(-105.0)
07 2.3191: Use demand controller or load shedder $10,212 $2,500 $10,212
-
kWh
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,449 $322 - $1,449
-
MMBtu
-
09 2.4133: Use most efficient type of electric motors $1,525 $720 $1,525
18,171
kWh
- -
TOTAL RECOMMENDED $37,710 $11,456 $19,183
106,389
kWh
$18,632
-
MMBtu
$(-105.0)
TOTAL IMPLEMENTED $10,829 $2,500 $10,829
7,327
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs