ITAC Assessment: RU0164
ITAC logo
ITAC Assessment: RU0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FLEXOGRAPHIC PRINTING
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area
n/a
Annual Production 1,225,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,630 577,081
kWh
Natural Gas $14,911 2,573
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,984 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,535

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $955 - $955
8,499
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,016 $522 $1,016
9,379
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,283 - $2,283
21,102
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $44 $500 $44
293
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $106 $44 $150
1,465
kWh
$(-44.0)
06 2.3212: Optimize plant power factor $2,580 $2,500 $2,580
-
kWh
-
TOTAL RECOMMENDED $6,984 $3,566 $7,028
40,738
kWh
$(-44.0)
TOTAL IMPLEMENTED $3,535 $2,500 $3,535
8,499
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs