ITAC Assessment: RU0162
ITAC logo
ITAC Assessment: RU0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product AIR DRYERS
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $5
M
to 10
M
# of Employees 12
Plant Area
n/a
Annual Production 2,400
pieces
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,853 455,744
kWh
Natural Gas $17,859 3,105
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,581

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $90 $750 $90
879
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $11 $31 $11
293
kWh
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,196 $2,500 $2,196
-
kWh
- -
04 2.7243: Improve air circulation with destratification fans / other methods $477 $1,080 $(-57.0)
(-586)
kWh
$534
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $104 $24 $128
1,172
kWh
- $(-24.0)
06 2.7231: Use radiant heater for spot heating $8,910 $10,500 - $8,910
-
MMBtu
-
TOTAL RECOMMENDED $11,788 $14,885 $2,368
1,758
kWh
$9,444
-
MMBtu
$(-24.0)
TOTAL IMPLEMENTED $9,581 $12,354 $161
1,465
kWh
$9,444
-
MMBtu
$(-24.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs