Assessment Year | 1992 |
---|---|
Principal Product | AIR DRYERS |
NAICS |
n/a
|
SIC | 3613: Switchgear and Switchboard Apparatus |
Sales Range | $5 M to 10M |
# of Employees | 12 |
Plant Area |
n/a
|
Annual Production | 2,400
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,853 | 455,744 |
kWh
|
$0.10 |
Natural Gas | $17,859 | 3,105 |
MMBtu
|
$5.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,788 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,581 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $90 | $750 |
$90
879
kWh
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $11 | $31 |
$11
293
kWh
|
- | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,196 | $2,500 |
$2,196
-
kWh
|
- | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $477 | $1,080 |
$(-57.0)
(-586)
kWh
|
$534
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $104 | $24 |
$128
1,172
kWh
|
- | $(-24.0) | |
06 | 2.7231: Use radiant heater for spot heating | $8,910 | $10,500 | - |
$8,910
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $11,788 | $14,885 |
$2,368
1,758
kWh
|
$9,444
-
MMBtu
|
$(-24.0) | ||
TOTAL IMPLEMENTED | $9,581 | $12,354 |
$161
1,465
kWh
|
$9,444
-
MMBtu
|
$(-24.0) | ||