| Assessment Year | 1992 |
|---|---|
| Principal Product | NON-OFFICE STAPLERS |
| NAICS |
n/a
|
| SIC | 3496: Miscellaneous Fabricated Wire Products |
| Sales Range | $50 M to 100M |
| # of Employees | 480 |
| Plant Area |
n/a
|
| Annual Production | 30,800,000
pieces
|
| Production Hrs. Annual | 5,760
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $280,681 | 2,837,046 |
kWh
|
$0.099 |
| Natural Gas | $147,199 | 28,610 |
MMBtu
|
$5.15 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,503 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $29,503 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,237 | $12,750 |
$4,237
42,790
kWh
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $707 | $322 | - |
$707
-
MMBtu
|
- | |
| 03 | 2.2514: Cover open tanks | $1,112 | $350 | - |
$1,112
-
MMBtu
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $3,501 | $849 |
$3,501
35,463
kWh
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $678 | - |
$678
6,741
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,367 | $507 |
$9,874
99,941
kWh
|
- | $(-507.0) | |
| 07 | 2.2422: Use waste heat from hot flue gases to generate steam | $9,901 | $11,500 | - |
$9,901
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $29,503 | $26,278 |
$18,290
184,935
kWh
|
$11,720
-
MMBtu
|
$(-507.0) | ||
| TOTAL IMPLEMENTED | $29,503 | $26,278 |
$18,290
184,935
kWh
|
$11,720
-
MMBtu
|
$(-507.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs