ITAC Assessment: RU0160
ITAC logo
ITAC Assessment: RU0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product NON-OFFICE STAPLERS
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $50
M
to 100
M
# of Employees 480
Plant Area
n/a
Annual Production 30,800,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $280,681 2,837,046
kWh
Natural Gas $147,199 28,610
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,503 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,503

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,237 $12,750 $4,237
42,790
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $707 $322 - $707
-
MMBtu
-
03 2.2514: Cover open tanks $1,112 $350 - $1,112
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $3,501 $849 $3,501
35,463
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $678 - $678
6,741
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $9,367 $507 $9,874
99,941
kWh
- $(-507.0)
07 2.2422: Use waste heat from hot flue gases to generate steam $9,901 $11,500 - $9,901
-
MMBtu
-
TOTAL RECOMMENDED $29,503 $26,278 $18,290
184,935
kWh
$11,720
-
MMBtu
$(-507.0)
TOTAL IMPLEMENTED $29,503 $26,278 $18,290
184,935
kWh
$11,720
-
MMBtu
$(-507.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs