ITAC Assessment: UD0194
ITAC logo
ITAC Assessment: UD0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PRECISION MACHINING
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,212 1,994,725
kWh
Natural Gas $5,723 979
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,091

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,611 $12,000 $6,203
112,544
kWh
$(-2,592.0)
-
MMBtu
-
02 2.7492: Use proper thickness of insulation on building envelope $2,065 $1,160 $565
10,844
kWh
$1,500
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $2,063 $1,000 - $2,063
-
MMBtu
-
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $3,352 $1,500 $2,860
114,889
kWh
$(-168.0)
-
MMBtu
$660
TOTAL RECOMMENDED $11,091 $15,660 $9,628
238,277
kWh
$803
-
MMBtu
$660
TOTAL IMPLEMENTED $11,091 $15,660 $9,628
238,277
kWh
$803
-
MMBtu
$660
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs