Assessment Year | 1992 |
---|---|
Principal Product | VENTILATOR FANS,BLOWERS |
NAICS |
n/a
|
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $50 M to 100M |
# of Employees | 140 |
Plant Area |
n/a
|
Annual Production | 25,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $232,228 | 2,216,002 |
kWh
|
$0.10 |
Natural Gas | $99,252 | 11,883 |
MMBtu
|
$8.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,960 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,334 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,698 | $416 |
$6,115
58,324
kWh
|
- | $(-417.0) | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,599 | - |
$9,599
91,442
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,544 | $522 |
$2,544
24,326
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,516 | - |
$3,516
33,411
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,178 | $3,750 |
$1,178
11,137
kWh
|
- | - | |
06 | 2.4312: Improve lubrication practices | $1,455 | $800 |
$1,455
13,775
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $3,066 | $1,964 | - |
$3,066
-
MMBtu
|
- | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,904 | $2,500 |
$8,904
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $35,960 | $9,952 |
$33,311
232,415
kWh
|
$3,066
-
MMBtu
|
$(-417.0) | ||
TOTAL IMPLEMENTED | $23,334 | $3,180 |
$20,685
196,952
kWh
|
$3,066
-
MMBtu
|
$(-417.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs