ITAC Assessment: UD0163
ITAC logo
ITAC Assessment: UD0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MATTRESSES,BOXSPRINGS
NAICS
n/a
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $10
M
to 50
M
# of Employees 224
Plant Area
n/a
Annual Production 240,000
pieces
Production Hrs. Annual 4,300
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,523 3,019,050
kWh
Natural Gas $166,814 26,168
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,705 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,516

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $19,896 $40,000 $19,896
-
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,556 - $2,556
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,583 $2,300 $3,181
36,049
kWh
$(-598.0)
-
MMBtu
04 2.7492: Use proper thickness of insulation on building envelope $22,293 $19,340 - $22,293
-
MMBtu
05 2.2437: Recover waste heat from equipment $16,003 $2,000 $12,950
248,828
kWh
$3,053
-
MMBtu
06 2.7261: Install timers and/or thermostats $17,374 $7,500 - $17,374
-
MMBtu
TOTAL RECOMMENDED $80,705 $71,140 $38,583
284,877
kWh
$42,122
-
MMBtu
TOTAL IMPLEMENTED $38,516 $11,800 $18,687
284,877
kWh
$19,829
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs