Assessment Year | 1985 |
---|---|
Principal Product | MATTRESSES,BOXSPRINGS |
NAICS |
n/a
|
SIC | 2515: Mattresses, Foundations, and Convertible Beds |
Sales Range | $10 M to 50M |
# of Employees | 224 |
Plant Area |
n/a
|
Annual Production | 240,000
pieces
|
Production Hrs. Annual | 4,300
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $201,523 | 3,019,050 |
kWh
|
$0.067 |
Natural Gas | $166,814 | 26,168 |
MMBtu
|
$6.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,705 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,516 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $19,896 | $40,000 |
$19,896
-
kWh
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,556 | - |
$2,556
-
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,583 | $2,300 |
$3,181
36,049
kWh
|
$(-598.0)
-
MMBtu
|
|
04 | 2.7492: Use proper thickness of insulation on building envelope | $22,293 | $19,340 | - |
$22,293
-
MMBtu
|
|
05 | 2.2437: Recover waste heat from equipment | $16,003 | $2,000 |
$12,950
248,828
kWh
|
$3,053
-
MMBtu
|
|
06 | 2.7261: Install timers and/or thermostats | $17,374 | $7,500 | - |
$17,374
-
MMBtu
|
|
TOTAL RECOMMENDED | $80,705 | $71,140 |
$38,583
284,877
kWh
|
$42,122
-
MMBtu
|
||
TOTAL IMPLEMENTED | $38,516 | $11,800 |
$18,687
284,877
kWh
|
$19,829
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs