| Assessment Year | 1992 |
|---|---|
| Principal Product | METAL HARDENING |
| NAICS |
n/a
|
| SIC | 3398: Metal Heat Treating |
| Sales Range | $1 M to 5M |
| # of Employees | 40 |
| Plant Area |
n/a
|
| Annual Production | 18,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $389,827 | 4,778,722 |
kWh
|
$0.082 |
| Natural Gas | $207,978 | 41,843 |
MMBtu
|
$4.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,182 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,848 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $2,324 | $577 |
$2,324
28,429
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,848 | - |
$1,848
22,567
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,041 | $63 |
$1,105
13,482
kWh
|
- | $(-64.0) | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $16,739 | $322 | - |
$16,739
-
MMBtu
|
- | |
| 05 | 2.4312: Improve lubrication practices | $1,929 | $800 |
$1,929
23,740
kWh
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,776 | $3,750 |
$1,776
21,688
kWh
|
- | - | |
| 07 | 2.2414: Use waste heat from hot flue gases to preheat | $21,525 | $23,000 | - |
$21,525
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $47,182 | $28,512 |
$8,982
109,906
kWh
|
$38,264
-
MMBtu
|
$(-64.0) | ||
| TOTAL IMPLEMENTED | $1,848 | - |
$1,848
22,567
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs