ITAC Assessment: KU0069
ITAC logo
ITAC Assessment: KU0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product FLOUR MILL MACHINERY
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area
n/a
Annual Production 300
pieces
Production Hrs. Annual 2,083
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $9,808 177,315
kWh
Natural Gas $7,245 2,019
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,545 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7441: Replace broken windows and/or window sash $1,931 $500 - $1,931
-
MMBtu
02 3.6123: Burn wood by-products for heat $1,077 $200 - $1,077
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $535 $810 $535
9,672
kWh
-
04 2.1123: Install automatic stack damper $352 $624 - $352
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $324 $128 $324
5,862
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $251 $390 - $251
-
MMBtu
07 2.2532: Use only amount of air necessary to prevent explosion hazard $75 $50 - $75
-
MMBtu
TOTAL RECOMMENDED $4,545 $2,702 $859
15,534
kWh
$3,686
-
MMBtu
TOTAL IMPLEMENTED $1,110 $1,328 $859
15,534
kWh
$251
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs