Assessment Year | 2000 |
---|---|
Principal Product | Electronics |
NAICS |
n/a
|
SIC | 3629: Electrical Industrial Apparatus, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
50,000
ft2
|
Annual Production | 180,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,713 | 1,383,646 |
kWh
|
$0.063 |
Electricity Demand | $31,876 | 4,126 |
kW-mo/yr
|
$7.73 |
Electricity Fees | $6,164 | - |
|
- |
Natural Gas | $13,770 | 2,055 |
MMBtu
|
$6.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $58,595 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $367 | $380 |
$279
4,396
kWh
|
$88
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,665 | $2,256 |
$1,267
19,343
kWh
|
$398
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $477 | $544 |
$286
4,396
kWh
|
$35
-
kW-mo/yr
|
- | $78 | - | $78 | |
04 | 2.2511: Insulate bare equipment | $981 | $272 |
$981
14,947
kWh
|
- | - | - | - | - | |
05 | 3.4156: Use flow control valves on equipment to optimize water use | $2,017 | $120 | - | - |
$2,017
-
Tgal
|
- | - | - | |
06 | 3.6192: Use a less expensive method of waste removal | $588 | $60 | - | - | - | - | $588 | - | |
07 | 4.452: Eliminate shift | $52,500 | $16,000 | - | - | - | $52,500 | - | - | |
TOTAL RECOMMENDED | $58,595 | $19,632 |
$2,813
43,082
kWh
|
$521
-
kW-mo/yr
|
$2,017
-
Tgal
|
$52,578 | $588 | $78 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs