Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FIBERFILL, BATTING
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area
n/a
Annual Production 8,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,092 842,321
kWh
Natural Gas $70,855 13,846
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,632 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $1,320 $800 $1,320
12,016
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $705 $3,250 $705
6,448
kWh
- -
03 2.8113: Purchase gas directly from a contract gas supplier $11,077 $5,000 - $11,077
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $598 $42 $640
5,862
kWh
- $(-42.0)
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $932 $150 $932
8,499
kWh
- -
TOTAL RECOMMENDED $14,632 $9,242 $3,597
32,825
kWh
$11,077
-
MMBtu
$(-42.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs