ITAC Assessment: AS0514
ITAC logo
ITAC Assessment: AS0514
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Archery Equipment
NAICS 339920: Sporting and Athletic Goods Manufacturing
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 198
Plant Area 78,600
ft2
Annual Production 33,000
units
Production Hrs. Annual 8,640
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,999 3,457,616
kWh
Electricity Demand $147,734 7,690
kW-mo/yr
Electricity Fees $63,906 -
Waste Disposal Costs
Water Usage $20,458 1,993
Tgal
TOTAL YEARLY COSTS $403,097
RECOMMENDED SAVINGS* $181,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $138,858 $8,368 $40,548
819,159
kWh
$(-1,690.0)
-
kW-mo/yr
- $100,000
02 2.9114: Use solar heat to make electricty $10,545 $141,340 $7,092
155,157
kWh
$3,453
-
kW-mo/yr
- -
03 2.4222: Install adequate dryers on air lines to eliminate blowdown $9,435 $4,628 $5,535
111,824
kWh
$3,900
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,222 $8,635 $3,082
62,249
kWh
$5,934
-
kW-mo/yr
$206 -
05 2.7263: Lower compressor pressure through a/c system modification $7,266 $30,762 $4,748
95,920
kWh
$2,518
-
kW-mo/yr
- -
06 2.4224: Upgrade controls on compressors $3,883 $1,160 $2,058
41,580
kWh
$1,825
-
kW-mo/yr
- -
07 2.4239: Eliminate or reduce compressed air usage $799 $1,584 $431
8,699
kWh
$368
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $772 $59 $503
10,165
kWh
$269
-
kW-mo/yr
- -
09 2.7135: Install occupancy sensors $498 $216 $498
10,056
kWh
- - -
TOTAL RECOMMENDED $181,278 $196,752 $64,495
1,314,809
kWh
$16,577
-
kW-mo/yr
$206 $100,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs