ITAC Assessment: RU0151
ITAC logo
ITAC Assessment: RU0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product WOMEN'S LINGERIE
NAICS
n/a
SIC 2341: Women's, Misses', Children's, and Infants' Underwear and Nightwear
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area
n/a
Annual Production 864,000
pieces
Production Hrs. Annual 2,907
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,928 1,279,308
kWh
Natural Gas $39,921 7,234
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,307 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,139

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $155 $483 $155
1,465
kWh
- -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $8,364 $8,875 $8,364
79,426
kWh
- -
03 2.2122: Install / repair insulation on condensate lines $44 $30 - $44
-
MMBtu
-
04 2.7226: Use computer programs to optimize hvac performance $7,804 $1,912 $7,804
74,150
kWh
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $17,890 $2,500 $17,890
-
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,050 $328 $3,377
31,946
kWh
- $(-327.0)
TOTAL RECOMMENDED $37,307 $14,128 $37,590
186,987
kWh
$44
-
MMBtu
$(-327.0)
TOTAL IMPLEMENTED $21,139 $3,341 $21,422
33,411
kWh
$44
-
MMBtu
$(-327.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs