ITAC Assessment: RU0148
ITAC logo
ITAC Assessment: RU0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product STEEL STRIPS
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $50
M
to 100
M
# of Employees 77
Plant Area
n/a
Annual Production 250,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,302 2,804,807
kWh
Natural Gas $9,759 1,925
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3312: Install efficient rectifiers $29,457 $65,000 $29,457
383,060
kWh
-
02 2.4312: Improve lubrication practices $5,460 $800 $5,460
70,926
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,308 $200 $3,308
43,083
kWh
-
04 2.3212: Optimize plant power factor $10,295 $180 $10,295
-
kWh
-
05 2.4133: Use most efficient type of electric motors $1,845 $233 $1,845
24,033
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $461 $392 $461
5,862
kWh
-
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,035 $12,250 $3,035
39,566
kWh
-
08 2.3212: Optimize plant power factor $4,107 $14,279 $4,107
-
kWh
-
09 2.6212: Turn off equipment during breaks, reduce operating time $2,993 $2,564 $2,993
38,980
kWh
-
10 2.7229: Air condition only space necessary $627 $1,650 - $627
-
MMBtu
TOTAL RECOMMENDED $61,588 $97,548 $60,961
605,510
kWh
$627
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs