| Assessment Year | 1992 |
|---|---|
| Principal Product | STEEL STRIPS |
| NAICS |
n/a
|
| SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
| Sales Range | $50 M to 100M |
| # of Employees | 77 |
| Plant Area |
n/a
|
| Annual Production | 250,000,000
pieces
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Maryland |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $215,302 | 2,804,807 |
kWh
|
$0.077 |
| Natural Gas | $9,759 | 1,925 |
MMBtu
|
$5.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $61,588 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3312: Install efficient rectifiers | $29,457 | $65,000 |
$29,457
383,060
kWh
|
- | |
| 02 | 2.4312: Improve lubrication practices | $5,460 | $800 |
$5,460
70,926
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,308 | $200 |
$3,308
43,083
kWh
|
- | |
| 04 | 2.3212: Optimize plant power factor | $10,295 | $180 |
$10,295
-
kWh
|
- | |
| 05 | 2.4133: Use most efficient type of electric motors | $1,845 | $233 |
$1,845
24,033
kWh
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $461 | $392 |
$461
5,862
kWh
|
- | |
| 07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $3,035 | $12,250 |
$3,035
39,566
kWh
|
- | |
| 08 | 2.3212: Optimize plant power factor | $4,107 | $14,279 |
$4,107
-
kWh
|
- | |
| 09 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,993 | $2,564 |
$2,993
38,980
kWh
|
- | |
| 10 | 2.7229: Air condition only space necessary | $627 | $1,650 | - |
$627
-
MMBtu
|
|
| TOTAL RECOMMENDED | $61,588 | $97,548 |
$60,961
605,510
kWh
|
$627
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs