ITAC Assessment: RU0140
ITAC logo
ITAC Assessment: RU0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product RUBBER, PLASTIC, METAL
NAICS
n/a
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 188
Plant Area
n/a
Annual Production 10,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,606 1,163,834
kWh
Fuel Oil #2 $124,966 24,562
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,314 $201 $1,718
14,947
kWh
- $(-404.0)
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $912 - $912
7,913
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $471 $272 $471
4,103
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $10,885 $500 - $10,885
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $892 $30 $892
7,913
kWh
- -
TOTAL RECOMMENDED $14,474 $1,003 $3,993
34,876
kWh
$10,885
-
MMBtu
$(-404.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs