ITAC Assessment: DS0145
ITAC logo
ITAC Assessment: DS0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Stainless Steel Screen Products
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 186,000
ft2
Annual Production 1,600,000
ton
Production Hrs. Annual 8,112
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,071 5,071,512
kWh
Electricity Demand $90,289 12,420
kW-mo/yr
Electricity Fees $4,199 -
Natural Gas $36,884 11,247
MMBtu
LPG $2,930 380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,985 $8 $482
14,654
kWh
$3,503
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,434 $462 $3,343
101,407
kWh
$1,091
-
kW-mo/yr
- -
03 3.4111: Use closed cycle process to minimize waste water production $15,332 $945 - - $10,221
-
Tgal
$5,111
-
Tgal
TOTAL RECOMMENDED $23,751 $1,415 $3,825
116,061
kWh
$4,594
-
kW-mo/yr
$10,221
-
Tgal
$5,111
-
Tgal
TOTAL IMPLEMENTED $8,419 $470 $3,825
116,061
kWh
$4,594
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs