| Assessment Year | 1991 |
|---|---|
| Principal Product | BEVERAGES |
| NAICS |
n/a
|
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
n/a
|
| Annual Production | 2,500,000
pieces
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $68,962 | 725,088 |
kWh
|
$0.095 |
| Natural Gas | $17,055 | 2,574 |
MMBtu
|
$6.63 |
| Fuel Oil #2 | $12,706 | 1,665 |
MMBtu
|
$7.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,241 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,340 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,125 | - |
$1,125
11,723
kWh
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $708 | $1,860 |
$832
8,792
kWh
|
- | - | $(-124.0) | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $665 | $57 |
$665
7,034
kWh
|
- | - | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $3,507 | $2,500 |
$3,507
36,928
kWh
|
- | - | - | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $302 | $500 | - | - |
$302
-
MMBtu
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $934 | $500 | - |
$934
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $7,241 | $5,417 |
$6,129
64,477
kWh
|
$934
-
MMBtu
|
$302
-
MMBtu
|
$(-124.0) | ||
| TOTAL IMPLEMENTED | $5,340 | $4,360 |
$5,464
57,443
kWh
|
- | - | $(-124.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs