ITAC Assessment: RU0129
ITAC logo
ITAC Assessment: RU0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PELLETS
NAICS
n/a
SIC 2865: Cyclic Organic Crudes and Intermediates, and Organic Dyes and Pigments
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,116 2,186,401
kWh
Fuel Oil #2 $5,398 720
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,423 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,904 $4,864 $4,584
67,409
kWh
$(-680.0)
02 2.6232: Install set-back timers $2,919 - $2,919
43,083
kWh
-
03 2.4312: Improve lubrication practices $2,919 $800 $2,919
46,893
kWh
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,874 - $6,874
-
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $807 - $807
12,016
kWh
-
TOTAL RECOMMENDED $17,423 $5,664 $18,103
169,401
kWh
$(-680.0)
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs