| Assessment Year | 1991 |
|---|---|
| Principal Product | SHEET METAL STAMPINGS |
| NAICS |
n/a
|
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
n/a
|
| Annual Production | 1,500,000
pieces
|
| Production Hrs. Annual | 3,920
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $233,758 | 2,560,961 |
kWh
|
$0.091 |
| Natural Gas | $69,253 | 12,611 |
MMBtu
|
$5.49 |
| Fuel Oil #2 | $16,564 | 2,700 |
MMBtu
|
$6.13 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,268 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,268 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,053 | - |
$2,053
22,567
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $9,332 | $272 |
$9,332
102,579
kWh
|
- | |
| 03 | 2.4312: Improve lubrication practices | $2,430 | $800 |
$2,430
26,671
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,576 | $326 |
$2,576
28,429
kWh
|
- | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,108 | $500 | - |
$1,108
-
MMBtu
|
|
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,769 | - |
$2,769
30,481
kWh
|
- | |
| TOTAL RECOMMENDED | $20,268 | $1,898 |
$19,160
210,727
kWh
|
$1,108
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $20,268 | $1,898 |
$19,160
210,727
kWh
|
$1,108
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs