ITAC Assessment: RU0124
ITAC logo
ITAC Assessment: RU0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SHEET METAL STAMPINGS
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 1,500,000
pieces
Production Hrs. Annual 3,920
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,758 2,560,961
kWh
Natural Gas $69,253 12,611
MMBtu
Fuel Oil #2 $16,564 2,700
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,268 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,268

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,053 - $2,053
22,567
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $9,332 $272 $9,332
102,579
kWh
-
03 2.4312: Improve lubrication practices $2,430 $800 $2,430
26,671
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,576 $326 $2,576
28,429
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,108 $500 - $1,108
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,769 - $2,769
30,481
kWh
-
TOTAL RECOMMENDED $20,268 $1,898 $19,160
210,727
kWh
$1,108
-
MMBtu
TOTAL IMPLEMENTED $20,268 $1,898 $19,160
210,727
kWh
$1,108
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs