ITAC Assessment: RU0123
ITAC logo
ITAC Assessment: RU0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CEMENT MILLS
NAICS
n/a
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 20,140
ton
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $248,836 3,990,621
kWh
Natural Gas $18,709 2,892
MMBtu
Fuel Oil #4 $141,198 31,108
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,280 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,611 - $2,611
41,911
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $3,413 $272 $3,413
54,807
kWh
-
03 2.7492: Use proper thickness of insulation on building envelope $7,866 $46,704 - $7,866
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $5,390 $5,320 $(-646.0)
(-10,258)
kWh
$6,036
-
MMBtu
TOTAL RECOMMENDED $19,280 $52,296 $5,378
86,460
kWh
$13,902
-
MMBtu
TOTAL IMPLEMENTED $19,280 $52,296 $5,378
86,460
kWh
$13,902
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs