ITAC Assessment: GT0134
ITAC logo
ITAC Assessment: GT0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product PLASTIC ITEMS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 46
Plant Area
n/a
Annual Production 21,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,228 910,903
kWh
Natural Gas $13,285 2,639
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,723 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $204

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $679 $1,900 - $679
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,005 $281 $2,005
47,773
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $835 $900 - $835
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $204 $200 $204
4,982
kWh
-
TOTAL RECOMMENDED $3,723 $3,281 $2,209
52,755
kWh
$1,514
-
MMBtu
TOTAL IMPLEMENTED $204 $200 $204
4,982
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs