ITAC Assessment: MO0094
ITAC logo
ITAC Assessment: MO0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Automotive Seat Covers
NAICS
n/a
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 305
Plant Area 110,000
ft2
Annual Production 122,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,233 1,462,778
kWh
Natural Gas $8,911 2,658
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,764

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,764 $35,485 $5,764
77,374
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,472 $1,418 $2,472
33,118
kWh
-
03 2.4133: Use most efficient type of electric motors $1,784 $9,001 $1,784
24,033
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $676 $1,605 $676
9,086
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $610 $690 $610
8,206
kWh
-
06 2.2211: Use optimum temperature $528 $200 $450
6,155
kWh
$78
-
MMBtu
TOTAL RECOMMENDED $11,834 $48,399 $11,756
157,972
kWh
$78
-
MMBtu
TOTAL IMPLEMENTED $8,764 $37,103 $8,686
116,647
kWh
$78
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs