ITAC Assessment: RU0114
ITAC logo
ITAC Assessment: RU0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COIL COATING & SLITTING
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area
n/a
Annual Production 167,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,137 2,237,104
kWh
Natural Gas $258,726 58,520
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $826 - $826
10,844
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $261 $214 $261
3,517
kWh
-
03 2.2437: Recover waste heat from equipment $1,104 $2,150 - $1,104
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $858 $700 $858
11,430
kWh
-
05 2.4312: Improve lubrication practices $2,850 $800 $2,850
37,515
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,509 $500 - $1,509
-
MMBtu
07 2.2422: Use waste heat from hot flue gases to generate steam $52,380 $15,000 - $52,380
-
MMBtu
08 2.4133: Use most efficient type of electric motors $1,442 $9,609 $1,442
19,050
kWh
-
TOTAL RECOMMENDED $61,230 $28,973 $6,237
82,356
kWh
$54,993
-
MMBtu
TOTAL IMPLEMENTED $61,230 $28,973 $6,237
82,356
kWh
$54,993
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs