ITAC Assessment: RU0112
ITAC logo
ITAC Assessment: RU0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product VINYL FILM
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area
n/a
Annual Production 25,900,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,002,304 16,905,041
kWh
Natural Gas $382,196 99,989
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,746 $368 $1,746
29,601
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,909 - $2,909
49,238
kWh
-
03 2.4312: Improve lubrication practices $10,102 $800 $10,102
171,161
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,299 $839 $5,299
89,977
kWh
-
05 2.2135: Repair and eliminate steam leaks $1,725 $430 - $1,725
-
MMBtu
06 2.4133: Use most efficient type of electric motors $5,807 $31,015 $5,807
98,476
kWh
-
TOTAL RECOMMENDED $27,588 $33,452 $25,863
438,453
kWh
$1,725
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs