ITAC Assessment: RU0110
ITAC logo
ITAC Assessment: RU0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product STEEL DOORS & PARTITIONS
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 50,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,027 530,774
kWh
Natural Gas $50,216 9,808
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,728 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,728

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $527 - $527
4,689
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $3,910 $1,133 - $3,910
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,407 - $1,407
12,309
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,640 $5,700 $5,640
48,652
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $693 - $693
5,862
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $2,009 $500 - $2,009
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $542 $162 $542
4,396
kWh
-
TOTAL RECOMMENDED $14,728 $7,495 $8,809
75,908
kWh
$5,919
-
MMBtu
TOTAL IMPLEMENTED $14,728 $7,495 $8,809
75,908
kWh
$5,919
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs