ITAC Assessment: RU0105
ITAC logo
ITAC Assessment: RU0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CHEMICAL SPECIALTIES
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area
n/a
Annual Production 7,000,000
pieces
Production Hrs. Annual 3,825
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,432 358,148
kWh
Natural Gas $297 39
MMBtu
Fuel Oil #2 $39,972 8,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,396 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,208

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4221: Install compressor air intakes in coolest locations $169 $419 $169
1,758
kWh
-
02 2.2414: Use waste heat from hot flue gases to preheat $3,748 $6,800 - $3,748
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,169 $500 - $3,169
-
MMBtu
04 2.2511: Insulate bare equipment $19 $136 - $19
-
MMBtu
05 2.2511: Insulate bare equipment $291 $72 - $291
-
MMBtu
TOTAL RECOMMENDED $7,396 $7,927 $169
1,758
kWh
$7,227
-
MMBtu
TOTAL IMPLEMENTED $7,208 $7,372 - $7,208
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs