ITAC Assessment: RU0097
ITAC logo
ITAC Assessment: RU0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product VAPOR BARRIERS
NAICS
n/a
SIC 2295: Coated Fabrics, Not Rubberized
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 256
thousand feet
Production Hrs. Annual 6,120
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,450 1,422,919
kWh
Natural Gas $247,543 50,010
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,455 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,777

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $631 - $631
7,034
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,503 $291 $1,503
16,999
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,103 $302 $1,103
12,309
kWh
-
04 2.2122: Install / repair insulation on condensate lines $218 $171 - $218
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,004 - $1,004
11,430
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,450 - $2,450
27,550
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $4,951 $500 - $4,951
-
MMBtu
08 2.2443: Re-use or recycle hot or cold process exhaust air $38,171 $13,250 - $38,171
-
MMBtu
09 2.2511: Insulate bare equipment $1,424 $625 - $1,424
-
MMBtu
TOTAL RECOMMENDED $51,455 $15,139 $6,691
75,322
kWh
$44,764
-
MMBtu
TOTAL IMPLEMENTED $10,777 $1,598 $4,184
46,893
kWh
$6,593
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs