Assessment Year | 1990 |
---|---|
Principal Product | VAPOR BARRIERS |
NAICS |
n/a
|
SIC | 2295: Coated Fabrics, Not Rubberized |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
n/a
|
Annual Production | 256
thousand feet
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $126,450 | 1,422,919 |
kWh
|
$0.089 |
Natural Gas | $247,543 | 50,010 |
MMBtu
|
$4.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,455 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,777 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $631 | - |
$631
7,034
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,503 | $291 |
$1,503
16,999
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,103 | $302 |
$1,103
12,309
kWh
|
- | |
04 | 2.2122: Install / repair insulation on condensate lines | $218 | $171 | - |
$218
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,004 | - |
$1,004
11,430
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,450 | - |
$2,450
27,550
kWh
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,951 | $500 | - |
$4,951
-
MMBtu
|
|
08 | 2.2443: Re-use or recycle hot or cold process exhaust air | $38,171 | $13,250 | - |
$38,171
-
MMBtu
|
|
09 | 2.2511: Insulate bare equipment | $1,424 | $625 | - |
$1,424
-
MMBtu
|
|
TOTAL RECOMMENDED | $51,455 | $15,139 |
$6,691
75,322
kWh
|
$44,764
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,777 | $1,598 |
$4,184
46,893
kWh
|
$6,593
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs