ITAC Assessment: IC0070
ITAC logo
ITAC Assessment: IC0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Portable Fans and Heaters
NAICS 333612: Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 428,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,897 8,729,852
kWh
Electricity Demand $61,072 17,012
kW-mo/yr
Electricity Fees $293,010 -
Natural Gas $258,877 54,797
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $270,257 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $114,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,895 $46,610 $19,136
308,650
kWh
$1,518
-
kW-mo/yr
- $(-1,205.0) $(-554.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,127 $2,716 $701
11,300
kWh
$124
-
kW-mo/yr
- $178 $124
03 2.7135: Install occupancy sensors $8,874 $22,864 $8,669
139,829
kWh
$205
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $51,638 $160,788 $42,670
688,063
kWh
$4,466
-
kW-mo/yr
- - $4,502
05 2.7221: Lower temperature during the winter season and vice-versa $1,377 - $1,377
22,210
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $56,367 $4,200 $52,222
842,290
kWh
$4,145
-
kW-mo/yr
- - -
07 2.6218: Turn off equipment when not in use $58,133 - $58,133
937,629
kWh
- - - -
08 2.7491: Insulate glazing, walls, ceilings, and roofs $73,846 $613,200 - - $73,846
-
MMBtu
- -
TOTAL RECOMMENDED $270,257 $850,378 $182,908
2,949,971
kWh
$10,458
-
kW-mo/yr
$73,846
-
MMBtu
$(-1,027.0) $4,072
TOTAL IMPLEMENTED $114,500 $4,200 $110,355
1,779,919
kWh
$4,145
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs