Assessment Year | 1990 |
---|---|
Principal Product | LIQUID & SOLID DETERGENT |
NAICS |
n/a
|
SIC | 2841: Soap and Other Detergents, Except Specialty Cleaners |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
n/a
|
Annual Production | 30,000,000
lb
|
Production Hrs. Annual | 2,990
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $109,175 | 1,135,111 |
kWh
|
$0.096 |
Natural Gas | $66,142 | 14,334 |
MMBtu
|
$4.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,694 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,906 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,050 | $2,500 |
$5,050
-
kWh
|
- | |
02 | 2.2135: Repair and eliminate steam leaks | $805 | - | - |
$805
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,071 | - |
$1,071
11,137
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $299 | $64 |
$299
3,224
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $888 | - |
$888
9,379
kWh
|
- | |
06 | 2.2122: Install / repair insulation on condensate lines | $73 | $94 | - |
$73
-
MMBtu
|
|
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,213 | $70 |
$3,213
33,411
kWh
|
- | |
08 | 2.2443: Re-use or recycle hot or cold process exhaust air | $1,145 | $373 | - |
$1,145
-
MMBtu
|
|
09 | 2.2163: Use minimum steam operating pressure | $4,150 | - | - |
$4,150
-
MMBtu
|
|
TOTAL RECOMMENDED | $16,694 | $3,101 |
$10,521
57,151
kWh
|
$6,173
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,906 | $70 |
$4,101
42,790
kWh
|
$805
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs